Erection Work Of Lilo To Proposed 66kv Ghoba Substation From Existing 66kv Mesanka220kv – Jesar Line No.1 On Tower With Acsr Panther Conductor Having Length Of 4.20 Rkm
Erection Work Of Lilo To Proposed 66kv Ghoba Substation From Existing 66kv Mesanka220kv – Jesar Line No.1 On Tower With Acsr Panther Conductor Having Length Of 4.20 Rkm