Work Of Removal Of Existing Ms/Cs Pipe & Fittings And Fabrication, Erection, Testing & Commissioning Of New Ss 316L Pipe And Fittings Of Various Size In Unit # 3 & # 4 At Stps On As And When Required Basis.
Work Of Removal Of Existing Ms/Cs Pipe & Fittings And Fabrication, Erection, Testing & Commissioning Of New Ss 316L Pipe And Fittings Of Various Size In Unit # 3 & # 4 At Stps On As And When Required Basis.