Service For Construction Of 4-lane Of Dewas-ujjain Section Of Nh752d From Design Km 0.000 To 19.733 Including Ujjain Bypass From Design Km 19.733 To 26.900 Parti And Dewas Bypass From Design Km 0.000 To 14.520 Partii Total Length Of 41.42 Km
Service For Construction Of 4-lane Of Dewas-ujjain Section Of Nh752d From Design Km 0.000 To 19.733 Including Ujjain Bypass From Design Km 19.733 To 26.900 Parti And Dewas Bypass From Design Km 0.000 To 14.520 Partii Total Length Of 41.42 Km